CH2M Hill Floor Plan - Spokane, WA CH2M Hill Floor Plan - Spokane, WA CH2M Hill Guest Seating In Reception Area  - Spokane, WA CH2M Hill Reception Desk - Spokane, Washington Entrance to CH2M Hill From Lobby - Spokane, WA CH2M Hill Reception Area - Spokane, WA

CH2M Hill

 

Location:

Spokane, WA

Square Footage:

10,500

Completion Date:

December 2008

Services
  • programming & analysis
  • space planning
  • lighting design & layout
  • fixture specification
  • finish selections
  • custom cabinetry design
  • electrical & data plans
  • construction documents
  • contract administration
Challenge

Design Source was commissioned by a property management company to assist in demonstrating how the proposed space in their facility would be advantageous to a potential tenant, CH2M Hill.  Because the space had been built out for several other tenants, it was difficult for CH2M Hill to visualize how the space would meet their goals of decreasing overhead and increasing employee productivity.

Solution

After an in-depth analysis of CH2M Hill's immediate and long term goals, we presented a detailed floor plan of the available space: both current and with the revisions we recommend to make the best use of space specific to their needs. Although our initial client was the property management company, once the lease agreement was signed, CH2M Hill hired us directly to ensure our design concept was taken to completion.